info@mindenpictures.com | 831 661 5551  | Login | Register

Premium wildlife and nature stock photos

for professional use
  • Results for
    • Transition Piece
  • (6)
Jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK.  July 2011
90787426
90787426 Jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. July 2011© Ashley Cooper
Transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore. The Walney Offshore Windfarm project, Barrow in Furness, Cumbria, England, UK.  Ju...
90787416
90787416 Transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore. The Walney Offshore Windfarm project, Barrow in Furness, Cumbria, England, UK. Ju...© Ashley Cooper
The Krakken, a jack up barge, constructing wind turbines of the Walney offshore wind farm, lifts a nacelle into place. Cumbria, England, UK. September 2011
90787415
90787415 The Krakken, a jack up barge, constructing wind turbines of the Walney offshore wind farm, lifts a nacelle into place. Cumbria, England, UK. September 2011© Ashley Cooper
The Ormonde Offshore Wind Farm during construction.  Barrow-In-Furness, Cumbria, England, UK. September 2011
90787410
90787410 The Ormonde Offshore Wind Farm during construction. Barrow-In-Furness, Cumbria, England, UK. September 2011© Ashley Cooper
Close up of turbine in Ormonde Offshore Wind Farm, Barrow-In-Furness, Cumbria, England, UK. September 2011
90787409
90787409 Close up of turbine in Ormonde Offshore Wind Farm, Barrow-In-Furness, Cumbria, England, UK. September 2011© Ashley Cooper
The Ormonde Offshore Wind Farm, Barrow-In-Furness, Cumbria, England, UK. September 2011
90787408
90787408 The Ormonde Offshore Wind Farm, Barrow-In-Furness, Cumbria, England, UK. September 2011© Ashley Cooper
powered by infradox.com